

EVIDENCE RECONCILIATION
From Metered Electricity to a Defensible Green Claim
A reconciliation and exception worksheet for procurement, metering and disclosure
Digital transformation · 1,460 words · 13 pages · 8 min read


EVIDENCE RECONCILIATION
A reconciliation and exception worksheet for procurement, metering and disclosure


EVIDENCE RECONCILIATION
A reconciliation and exception worksheet for procurement, metering and disclosure
EVIDENCE RECONCILIATION / Executive summary
The same electricity records can support different disclosures, each with separate rights and verification. A 1,000 MWh site case follows metering, settlement and certificate allocation, distinguishing eligible coverage, duplicate or out-of-period instruments and unresolved volumes.
Procurement, finance and sustainability can all report valid figures that support different claims. Procurement may report contracted MWh, finance settled costs, and annual reporting requires consumption and usable evidence. State the organisational boundary, metering period, reporting standard and attribute treatment before comparing them. NEA rules govern renewable electricity attributes through issuance, trading and management of certificates.
Assign a definition ID to each use, with sites, ownership or control, consuming entities, conversion and sign-off. A group report may use operational control, a product disclosure one line, and policy reporting another population. Finance reconciles master-meter use to billing before allocating it. Assign responsibility for shared meters, tenants and on-site self-use before differences arise.
China's trial non-fossil electricity guidance sets out physical and market-based recognition for its specified accounting purposes; non-fossil includes nuclear. GHG Protocol Scope 2 addresses indirect emissions from purchased energy and applies instrument quality criteria under the market-based method. Derive separate results from the same evidence base. Check attribute rights and exclusivity in customer contracts separately.
Retain meters and registry evidence underneath use-specific outputs.
ZHICE reconciliation illustration. Confirm the rules and intended use.
Connect contracts, settlement, registry and meters using traceable keys. Link sites, metering accounts, settlement periods and registry references. Record the original transaction and the end user when supply is split, accounts aggregate or purchases are delegated. Retain a verifiable certificate identifier, origin, generation month, transfer and retirement or another status. Similar names, dates or totals are weak join keys.
Settlement proves delivery, contracts describe the environmental rights conveyed, and registry records verify their status and ownership. Align periods while retaining original time resolutions. Compare contract provisions with settlement coverage, then test registry vintages under the chosen disclosure rules. Hold items that clear only the first two stages. Record the source, reviewer and rejection reason before closing them.
When a purchase serves multiple subsidiaries, establish a gross allocation and reserve sub-allocations for particular entities and periods. Reverse an invalid allocation through a traceable offset and verify registry status before making the item available again. Reviewers should be able to drill from a claim to meters, transactions, allocations and certificates, and work backwards from a certificate to affected disclosures.
Retain evidence and allocations so aggregation cannot hide differences.
ZHICE reconciliation illustration. Confirm the rules and intended use.
Assume verified site use of 1,000 MWh. On-site generation covers 210 MWh with applicable evidence. Bundled renewable purchases supply 420 MWh, including the associated instruments. A request adds 350 unbundled certificates. Fifty duplicate previously allocated instruments or miss the vintage requirement. The 300 eligible certificates cover 300 MWh at one MWh each, for 930 MWh of coverage.
Leave 70 MWh uncovered and keep proposed remedies separate from closed claims. Scenario one models 70 additional eligible certificates if they can be retired before cutoff. A second recalculates as registry corrections or customer coverage change. Do not infer status from a coverage target. Store plan, confirmed volumes and exceptions together, without changing attributes to match subsidies, trades or expense treatment.
Test in two directions: add eligible attributes against consumption to check the ceiling and residual, then use certificate IDs to find competing allocations across entities. Do not stop at the portfolio percentage. If one meter serves several products, document how volume allocation, order periods and rounding can be reproduced within the reporting period.
Show eligible attributes and the residual against 1,000 MWh.
Hypothetical ZHICE site case. MWh and certificate status are assumptions.
| Ledger item | Gross quantity | Counted | Difference to explain |
|---|---|---|---|
| Verified use | 1,000 | 1,000 denominator | Master and submeters reconciled |
| On-site use | 210 | 210 | Attributes retained |
| Bundled purchase | 420 | 420 | Instruments included |
| Additional certificates | 350 | 300 | 50 excluded |
| Uncovered use | — | 70 | Remediation subject to review |
Maintain an allocation register using the instrument identifier, quantity, transaction and beneficiary as the unit of review. Map rights to reporting boundaries before calculating and retain registry snapshots with timestamps. Volumes can be split; instruments may have an exclusive state. Follow registry rules rather than internal labels. Trace request, reservation, review, retirement or other closing status in sequence.
Contracts verify title and trade terms. Metering verifies entities and periods. Disclosure owners explain external claims. When one affiliate buys for several sites, verify agency, transfer, claim rights and unused balance. Site leads can challenge allocation inputs without changing another entity's confirmed use. Reserve each instrument once during concurrent submissions and route exceptions to review.
Exceptions often arise where uses seem similar. A batch may support the company's Scope 2 accounting or be transferred to a customer. Compare what each claim says about exclusive rights and avoid conveying those rights twice. Distinguish one entity citing an existing result in multiple channels from reallocating the underlying instrument. Log method, entity and report version and keep past records traceable through corrections.
Independent review is needed before a business request becomes a confirmed allocation.
ZHICE reconciliation illustration. Confirm the rules and intended use.
Apply vintage and finer matching within identified rules. NEA implementing rules require matching production and consumption years from 2026, and in principle limit retirement to actual consumption, and encourage more precise matching. The November GHG Protocol workshop discusses Scope 2 revisions and time matching, with consultation still ahead. Record proposals, voluntary commitments and current rules separately.
Monthly or hourly matching first exposes limits of contracts and data. If meters record 15 minutes and instruments only a generation month, flag that the instrument does not identify an hour. Check whether purchases and volumes align with the applicable market boundary. Run a shadow ledger for one site. Compare matched volumes and gap intervals, and test the cost effects of procurement, storage and shifting demand during expensive hours.
For investment, show matches supported today, volumes a data upgrade could substantiate and gaps that require changes in supply or demand. Where preparation is inexpensive, request source generation or a traceable delivery interval in the next contract. Tie significant changes in energy use to the progress of external requirements and customer willingness to pay. Budget optional readiness and mandatory compliance separately.
Test evidence at the time resolution required by the claim.
ZHICE reconciliation illustration. Confirm the rules and intended use.
Start with routine differences, then test title and cutoff. Meter and settlement disagreements require billing and period checks. Vintage or status mismatches need procurement and registry review. Duplicate reservations require a hold and tracing of affected claims. Close rules should state which differences can be explained by units, losses or a metering correction, and which need external evidence and formal sign-off.
Annual data can pass through monthly close, a midyear adjustment, year-end and external review. Separate official snapshots from estimates and retain the submitter, changes and approvals. When an issue affects a published disclosure, preserve the prior value. Assess materiality and correction terms, have the responsible entity determine how to correct and keep both versions. Reproduce the correction from original evidence and the allocation order.
Rank exceptions by materiality and work to resolve. Overlapping claims across entities can require customer confirmation through legal. Missing meter data may be resolved at settlement. Unassigned certificates cannot fill residual use automatically. Time-box material cases, close on the substantiated amount when gaps persist and record potential adjustment. Reviewers should be able to reproduce one case from detection to acceptance.
Keep the snapshot used in each annual report version.
ZHICE reconciliation illustration. Confirm the rules and intended use.
| Exception | Owner | Closure evidence | If unresolved |
|---|---|---|---|
| Meter variance | Energy metering | Period-aligned reconciliation | Hold unmatched volume |
| Vintage mismatch | Procurement | Corrected certificate or delivery | Exclude in period |
| Ownership conflict | Contracts and legal | Rights and allocation approval | Hold disputed batch |
| Duplicate use | Disclosure review | Deduplication record | Trace affected entities |
Measure delivered energy and eligible evidence coverage independently. A supplier that meets energy schedules must still be assessed on evidence timing, substitution, traceability and end-user restrictions. Classify exceptions as late data, invalid attributes and volumes to replace. Tie these to service levels. In bid comparisons, price the risk that equivalent evidence is unavailable before reporting closes.
Use verified exceptions in the next procurement round. Specify formats, eligible vintage, delivery dates, correction authority and disputes. Optional hourly preparation can require plant generation records and update frequency with a defined scope. For sites with little direct incentive for metering upgrades, reduce reconciliation work and cross-entity disputes first, then value improved timeliness or precision.
Track on-time evidence, duplicate reservation frequency and closure duration, with denominators. An annual coverage target alone can push avoidable work to year-end. Each quarter separate causes in supplier performance, internal allocation, varied load or batch processing. Update sourcing and ownership, retaining prior metrics and checking whether gaps fell across a comparable portfolio.
Use closed exceptions to distinguish supplier and internal responsibility.
ZHICE reconciliation illustration. Confirm the rules and intended use.
Give reviewers meter totals, transaction allocation, registry snapshots, claim definitions and exception approvals with traceable references. Select large, complex or error-prone items to test affiliate allocation, cutoff and self-use, then sample routine entries for period and unit consistency. Cover sources that could materially change results and disclose sampling and unresolved scope.
Rebuild the denominator from metering by site and boundary, and the numerator from categories, periods and final status. Version the applicable rules, judgement and changes so a new owner can reproduce earlier results. Verify review permissions and evidence retention. Obtain written confirmation for uncertain rights from the contract or registry owner.
Pilot a full reconciliation for one entity and one defined use, from contracted volumes and evidence to the resulting claim. Expand after procurement, metering, finance and reporting sign off. Within 60 days review closure time, unusable evidence and time needed to explain externally. Turn missing data and ownership gaps into deliverable requirements. Preserve residual explanations so improvements can be tied to decisions.
Track quantities with missing evidence separately.
ZHICE reconciliation illustration. Confirm the rules and intended use.
Sources as of 2026-11-15. The original sources cited in this report are listed below. Business analysis, frameworks and recommendations are ZHICE interpretations and do not represent the views of the source organizations.
Public sources provide industry and regulatory context; they do not establish the circumstances of any individual company. Recommendations require further assessment against local rules, company operating data, staff capabilities and risk tolerance. The diagrams and management tables do not present unverified statistical findings.
Evidence reviewed through 15 November 2026. The reconciliation case is hypothetical. Apply the governing instruments, contracts and current standards for each claim.
Tell us about the decision, business challenge or transformation ahead. Let’s define the next step together.